Application of AGV for automatic painting of wind turbine blades on an 8t automatic painting line

Project Background:


The wind turbine blade painting room poses a significant risk to human health, and manual painting operations pose a significant safety risk. Additionally, the environment inside the painting room is unique, and the equipment needs to have explosion-proof treatment capabilities. The customer requires an AGV that has omnidirectional movement, collision and explosion prevention, emergency stop and other functions, and can be equipped with a robotic arm to maintain a certain distance from the blades for automatic spraying operations, replacing manual operations.

 



Solution:


Hangfa provides AGVs for automatic painting lines, with a carrying capacity of 8 tons. Laser distance sensors are used to detect the distance between the blades, which can maintain a certain distance from the blades for walking. Two AGVs on the left and right are symmetrically used for automatic painting operations, with a stopping accuracy of ± 10mm. AGV has two types of power supply: explosion-proof battery power supply and direct insertion power supply. The overall protection level of the vehicle is IP54, and the explosion-proof level is Exd Ⅱ B T4 Gb. And it has two control modes, automatic and manual, which can communicate with PLC. It adopts Profinet communication mode and can display equipment status in real time.

 


External dimensions

Lift stroke

Load capacity

5000×2600×600mm

/

8t




More Case

  • case-img
    OmniRhino

    Application of 40t blade automatic transfer AGV in the transfer of wind turbine blades

    Project Background:The traditional fuel forklift transportation meth···

    More >
  • case-img
    OmniRhino

    Application of 13t heavy-duty omnidirectional vehicle in automatic assembly line of bogie frame

    Project Background:This project is applied to the automatic assembly···

    More >
  • case-img
    OmniRhino

    Multiple heavy-duty omnidirectional vehicles are used for the transportation of titanium lumps/magne

    Project Background:The project site requires the transportation of t···

    More >
View more case studies >