Industry customization | Wind turbine blade transfer vehicle
time:2023-09-25
source:Hangfa News
With the accelerated development of clean energy industries such as wind power generation in China, the power of wind turbines continues to increase, and the volume, length, and weight of wind turbine blades are becoming increasingly large, making it increasingly difficult to transport the blades within the factory area. The longer the blade, the more difficult it is to transport, and the production cost gradually increases. How to achieve safe and economical transportation of blades is a technical challenge worth considering.
More News
-
2025/04/25 Case sharing | 8t radial wire reel AGV empowers intelligent upgrade of wire roll handling
-
2025/03/05 Industry case | Application of lifting heavy-duty AGV in automated assembly of petroleum machinery
-
2025/01/21 Never forget the original intention, move towards a new path | The 2025Hangfa Annual Conference Cere